St John’s College Cambridge

Sector: Education   Location: Cambridge

  • Client

    St John's College

  • Project Value

    £650,000

  • Project Length

    6 months

  • Contractors

    CPS Building Services Ltd

  • Designers

    Building Services Design

  • ?>

St John's College, Cambridge

Apex deliver Principal Designer services on Boiler replacement project

We were appointed as Principal Designer to St John’s College, Cambridge, on this project to deliver the refurbishment of the Bridge Street Boiler House.

The works included the replacement of 3 boilers with new, and replacement of the associated pipework and controls.

During the works a temporary hot water service was installed to ensure the services to this student accommodation was maintained.

The project was successfully delivered in September 2018.

Other projects